Search by job, company or skills

bureau veritas group

HSE Manager (Data Center Construction) at Chonburi - Contract Basis

This job is no longer accepting applications

  • Posted a month ago

Job Description

Scope Of Work

  • be responsible for developing, implementing, and overseeing all EHS-related activities for Data Center's construction and fit-out stages up till the end of project. The scope includes planning, documentation, training, audits, reporting, and continuous improvement throughout project execution. And the EHS-related documentation, training and other close-out work after project closure.
  • Preparation and review of project-specific EHS Plans and Emergency Response Plans (ERP)
  • Conducting EHS risk assessments (HIRA/JSA) and hazard identification
  • Monitoring compliance and statutory requirements
  • Performing EHS inspections, audits, and corrective action tracking
  • Supporting incident investigation and root cause analysis
  • Managing EHS document submission through the Digital Asset Management System (DAMS)
  • Providing regular reports and improvement recommendations
  • Safety in design risk assessment
  • Site walk report
  • HRA 3-weeks lookahead forecast
  • Safety performance scoring
  • Other EHS related activities
  • Candidate shall comply with all applicable EHS laws, codes, and standards including OSHA, NFPA, and local regulations. All activities must conform to EHS framework.
  • Candidate must ensure that work is performed safely and that high-risk activities are managed under a Permit-to-Work system.
  • Core EHS areas include:
    • Working at Heights | Lifting Operations | Confined Space Entry | Electrical Safety | Ground Disturbance
    • Hazardous Materials | Energy Isolation | Mobile Equipment | Environmental Protection | Ergonomics
Deliverables

  • Project-specific EHS Plan and Risk Assessment (HIRA/JSA)
  • Emergency Response Plan (ERP)
  • Weekly and Monthly EHS Reports
  • Incident Notification and Investigation Reports
  • EHS Training Plans and Attendance Records
  • Safety Audit Reports and Compliance Dashboards
  • Close-out Report and Lessons Learned Summary
  • Contractor performance evaluation form
  • HRA lookahead Guidance Document
  • Other deliverables

Qualification Requirements

  • Specializing in EHS or Construction Safety
  • Minimum 5 years of experience in mission-critical or data center projects
  • Certified professionals (e.g., ISO 45001, NEBOSH, or equivalent)
  • Proven record of implementing OSHA/NFPA-based systems
  • Experience with American customer or similar high-technology clients preferred

More Info

Job Type:
Industry:
Employment Type:

Job ID: 146971423